Triveni Polymer ( Gerresheimer)

The project was the fit-out of the New Manufacturing Facility at Kausamba – Surat Gujarat of 65,000 sq ft of constructed area.The building consists Ground + 2 Floor Open Area for Machinery , Storage area and Utility Area and Utility Building .

The electrical scope of works comprised Electrical Load Liaison, SITC Of New 1 now of 1500 Kva Tx , HT Rmu & VCB Panel , SITC of PCC panel, APFC Panel ,PDB Panel, LT Cabling, PDB Cabling , Power Socket work , Cable Tray and Its fabrication job & Plant lighting.

The installation was started in December 2021 & completed in April 2022.

Client : – Triveni Polymer Pvt Ltd
Consultant – S3M Consultant
Project : – Contract
Project engineer:- Rakesh Prajapati/Darshan nakum

Pilate Studio

The project was the fitout of the new Showroom of around 1,500 sq.ft .The showroom consists of Different Display area in Ahmedabad . Electrical scope of works comprised installation of lighting & emergency lighting, installation, Communication system installation , CCTV & PA Work. The installation was completed in June 2024.

The project was the fitout of the new Showroom of around 1,500 sq.ft .The showroom consists of Different Display area in Ahmedabad . Electrical scope of works comprised installation of lighting & emergency lighting, installation, Communication system installation , CCTV & PA Work. The installation was completed in June 2024.